INDUSTRIAL TRIAL 1

Customer:
Production: Garage doors
Material: panel sandwich Al+PU
Actual system: pre-painted coil
Needs: low temp, non need to speed up the process
Pulvercoat aspect: fine textured
Curing condition required: 20 min. @ 115°C
Results: perfect curing , no deformation of PU

 

 

 


INDUSTRIAL TRIAL 3

Production: Gas Bottle
Material: Steel
Actual system: powder Coating
Needs: Improve the curing
Pulvercoat aspect: smooth
Curing condition required: 20 min. @ 115°C
Results: very good appearance and curing,polymerization cycle reduced by 50%

 

 


INDUSTRIAL TRIAL 5

Production: agricoltyral parts
Material: Steel
Actual system: powder Coating
Needs: Improve the curing
Pulvercoat aspect: smooth
Results: very good appearance and curing,polymerization cycle reduced by 50%

INDUSTRIAL TRIAL 2

Production: Gas valve (plastica gasket inside)
Material: steel
Actual system: liquid coating
Needs: substitute liquid with powder
Pulvercoat aspect: smooth
Curing condition required: 25 min. @ 130°C
Results: perfect curing , no deformation of the gasket

 

 


 

 

INDUSTRIAL TRIAL 4

Production: Heavy metal parts 350 kg
Material: Steel
Actual system: powder Coating
Needs: Curing time reduction
Pulvercoat aspect: smooth
Curing condition required: 40 min. @ 130°C
Results: very good appearance and curing,polymerization cycle reduced by 60%

 


 

 

INDUSTRIAL TRIAL 6

Production: automotive part
Material: Carbon Fiber
Actual system: Liquid Coating
Needs:Substitute liquid paint and reduce cycle time
Pulvercoat aspect: clear, smooth
Curing condition required: 20 min. @ 115°C
Results: very good appearance and curing,polymerization cycle reduced by 50%